Table of Contents > Installing gearbox

VW ID.4 Speed Gearbox ➜ Installing gearbox

ID.4 2021 ➤  
1-speed gearbox 0MJ, front - Edition 05.2021  
2
Removing and installing gearbox  
Removing gearbox  
2.1  
Gearbox and three-phase current drive 2 -VX97- along with  
power and control electronics for electric drive 2 -JX4- are com‐  
prised in one unit and are removed together ⇒ Rep. gr. 10;  
Removing and installing front motor; Removing motor.  
Currently, no work is performed that requires separation of the  
motor from the gearbox, or disassembly of the gearbox. Aer‐  
ial 1 for mobile-controlled entry and start authorisation system  
-R415-  
2.2  
Installing gearbox  
Gearbox and three-phase current drive 2 -VX97- along with  
power and control electronics for electric drive 2 -JX4- are com‐  
prised in one unit and are installed together ⇒ Rep. gr. 10;  
Removing and installing front motor; Installing motor.  
– Following installation, ⇒ Rep. gr. 34; check gear oil level.  
4
Rep. gr.34 - Controls, housing  

Need help?

If after viewing the owner's manual or service manual you still have some unresolved questions about the car VW ID.4 you can write to us using the link below, describing your problem in detail, we try to answer all questions.


Ask your question on the page - Support!