Table of Contents > Sunroof > Minimum drying time for adhesives

VW ID.4 Body Repairs Exterior ➜ Minimum drying time for adhesives

ID.4 2021 ➤  
General body repairs, exterior - Edition 05.2021  
2
Sliding sunroof  
2.1  
Minimum drying time for adhesives  
Special standards must be adhered to when replacing bonded  
glass panels. One of these standards is, for example, that a  
freshly bonded glass panel must comply with the safety require‐  
ments, even in an accident, following the minimum drying time.  
The minimum drying time is the time from bonding in until the  
vehicle is ready to be used. During the minimum drying time,  
the vehicle must be parked on a level surface at room tempera‐  
ture (above 15 °C).  
The vehicle is safe to use only after the minimum drying time  
has elapsed.  
Observe minimum drying time.  
The minimum drying time for 2-component window adhesive is  
2 hours.  
2.2  
Assembly overview – glass panel  
1 - Glass panel  
❑ ⇒ Rep. gr. 60; Remov‐  
ing and installing glass  
panel  
2 - Bonding surface  
3 - Spacer  
4 - Centring pin  
130  
Rep. gr.60 - Sunroof  

Need help?

If after viewing the owner's manual or service manual you still have some unresolved questions about the car VW ID.4 you can write to us using the link below, describing your problem in detail, we try to answer all questions.


Ask your question on the page - Support!